Schomp One Price
2026 Mazda CX-5
2.5 S Preferred
- MSRP$36,910
- Customer Cash-$1,000
- Dealer Discount-$1,035
- Dealer Handling Fee$0
- Schomp One Price™$34,875
- You may also qualify for...
- Exclusive Mazda Loyalty Reward-$750
- Military Appreciation Incentive Program-$500
- MNAO Mobility Program-$1,000
- Coaches Promo Code Program-$250
- Drive Program Promo Code Program-$250
Basic information
Stock #
VIN
Description
Introducing the Mazda CX-5 Preferred AWD, a refined and capable sport utility vehicle designed to bring confidence and comfort to every drive. Finished in Machine Gray Metallic, this CX-5 combines sleek style with the practicality of standard all-wheel drive, making it a great fit for daily commuting, weekend travel, and changing road conditions. Under the hood, it features a 2.5L inline 4-cylinder gasoline engine with 187 horsepower, paired with an automatic transmission for smooth and responsive performance. Mazda’s engineering focus helps deliver a balanced driving experience, while standard traction control and ESC support added stability on the road. Inside, the CX-5 is built with driver and passenger protection in mind. It comes equipped with front, knee, side, and curtain airbags, along with seat belt pretensioners for the first and second rows. Additional standard safety features include ABS and an auto reverse system, helping provide added peace of mind for you and your passengers. With its versatile SUV design, all-wheel drive capability, and Mazda’s signature attention to driving dynamics, the CX-5 Preferred AWD offers a smart blend of utility, style, and everyday comfort. At Schomp Mazda, we prioritize building enduring connections with our customers, extending beyond mere car sales. Whether you're eyeing a sleek sedan, a versatile SUV, or a powerful truck, our devoted team is committed to assisting you every step of the way. We are proudly recognized as a CarFax Top-Rated Dealer and DealerRater Dealer of the Year, and are dedicated to demonstrating the exceptional customer service that earned us this distinction for many years to come. Embrace simplicity and transparency with our renowned One Price. One Person. One Hour.® philosophy, eradicating the need for tiresome negotiations and wasted time. Coupled with the support of a dedicated Client Advisor, you can expect a seamless journey from vehicle selection to financing. Please confirm the accuracy of the included equipment by calling us prior to purchase. Schomp Mazda is proud to be recognized as a 2025 CarFax Top Rated Dealer, and 2026 DealerRater Dealer of the Year. - Advertised pricing does not include applicable sales tax, title, registration, governmental fees, finance charges, emissions testing, or customer-requested transportation costs. A $33 VITU electronic title processing fee applies to Colorado transactions. Out-of-state finance and lease transactions may include applicable VITU processing fees, which vary by state, and a MavSign remote notary/signing fee starting at $285.
Features
Dealership Information
Sunday
Closed
Monday
9:00am - 7:00pm
Tuesday
9:00am - 7:00pm
Wednesday
9:00am - 7:00pm
Thursday
9:00am - 7:00pm
Friday
9:00am - 7:00pm
Saturday
9:00am - 7:00pm
2026 Mazda CX-5
2.5 S Preferred
- MSRP$36,910
- Customer Cash-$1,000
- Dealer Discount-$1,035
- Dealer Handling Fee$0
- Schomp One Price™$34,875
- You may also qualify for...
- Exclusive Mazda Loyalty Reward-$750
- Military Appreciation Incentive Program-$500
- MNAO Mobility Program-$1,000
- Coaches Promo Code Program-$250
- Drive Program Promo Code Program-$250